Test Results on Boston Spot Network Interconnection at Williams Building: Presentation by W. E. Feero, P.E.
December 16, 2005 (9:00 AM - 12:30 PM)
John F. Kennedy Federal Building, Boston
The MTC, the Massachusetts DG Collaborative and the US General Services Administration held a workshop for W.E. Feero to present the results of his analysis of detailed data on the performance of the DG systems interconnected to the NSTAR downtown network at the GSA's Williams Building.
The findings of a two year monitoring study of the protection performance for the Distributed Generation, DG, installations at the Williams Building was presented. The generation consisted of a 28 kW photovoltaic system and a 75 kW induction generator. The study also included a simulation of the spot network system, the induction generator, and the photovoltaic system's interfacing inverter using the commercially available PSCAD electromagnetic transients program. The simulation allowed the findings of the study to be extended to larger generation installations and to all three generation types: induction, synchronous, and inverter interfaced.
Agenda: |
1. Description of DG Installations (CHP and PV), |
|||||||||||||||||||||
Attendees |
Invitation only (if interested, please contact MTC) | |||||||||||||||||||||
Read Ahead Materials -- Williams Building:
Read Ahead Materials -- Other:
|
||||||||||||||||||||||
Other Information Friday, December 16, 2005 -- start time: 9:00 AM This workshop was hosted by the General Services Administration at:
For directions and parking info , please see this pdf file. Or, for a map of a wider part of the city, including nearby hotels, click here. You may dial in to listen to presentation and meeting at the following number: 1-978-353-2600, access code 0127404. For questions about the substantive content of this workshop, contact:
For questions about the meeting location, contact:
For other questions, contact:
|
||||||||||||||||||||||