DG Installations in Massachusetts

The tracking data submitted to the DG Collaborative by the Massachusetts utilities covers a 2-year period and is presented in detail below on this page.  The type of data and reporting will change in the future, as described at the following page:

This future data will represent an expansion of a data series that began after the 1997 Restructuring Act.  Some of the historical data is available at:

Additional data on Massachusetts projects is available at:

Tracking data on interconnection activity April 2004 - March 2006

One reason for the extension of the DG Collaborative to June 2006 was to allow for a review of the experience with the new Interconnection Tariffs that went into effect in April of 2004. The data to be collected on a quarterly basis was specified in the DG Collaborative's 2003 Report (Appendix C, page 50).  The current data specifications are documented, and the first-year results are summarized, in this excerpt from Chapter 1 of the 2005 Report.

Summary of DG Application Data Tracking Results (April 2004 - March 2006):

Cumulative DG Applications for Interconnection (kW and applications) over first two years of the Tariff (excel file, 161 KB, 2 charts)

Data Tracking Spreadsheet:

  Aggregate (excel file, 218 KB)

Data Tracking Spreadsheets for each distribution company (in 1 zip file, 106 KB):

Cumulative:            2 Years through 2006 Q1

 

 

 

 

 

 

 

 


The names and addresses of individual projects are not included in this data.  Data is not reviewed by the Collaborative for particular projects for which the owner has requested this confidentiality, but the aggregate results include such projects (e.g., in totals and averages).


For comparison, see CHP Units located in Massachusetts (approx. 110 units were listed as of June 2006 in this on-line database supported by DOE and ORNL and maintained by Energy and Environmental Analysis Inc.  Of these, 10 have on-line dates in 2004 and 2005, totalling 1,700 kW.)


Summary of DG Application Data Tracking Results (April 04 - December 2005, pdf file)

Data Tracking Spreadsheet:

  Aggregate (excel file, 1.3 MB)

Data Tracking Spreadsheets for each distribution company (1 zip file, 338 KB):

  Fitchburg Gas & Electric

  National Grid/Mass Electric

  NSTAR

  Western Mass Electric

Cumulative through 2005 Q4

 

 

 

 

 

 

Summary of DG Application Data Tracking Results (April 04 - Sept. 05, pdf file)

Data Tracking Spreadsheet:

  Aggregate (1 Excel file, 1.3 MB)

Data Tracking Spreadsheets (1 Zip file, 478 KB):

  Aggregate

  Fitchburg Gas & Electric

  Mass Electric

  NSTAR

  Western Mass Electric

Cumulative through 2005 Q3

 

 

 

 

 

Summary of DG Application Data Tracking Results (April 04 - July 05, word file)

Data Tracking Spreadsheet (excel file):

  Aggregate

Data Tracking Spreadsheets (1 zip file):

  Aggregate

  Fitchburg Gas & Electric

  Mass Electric

  NSTAR

  Western Mass Electric

Cumulative through 2005 Q2

 

 

 

 

 

Data Tracking Spreadsheets (excel files):

Aggregate

Fitchburg Gas & Electric

Mass Electric

NSTAR

Western Mass Electric

Cumulative through 2005 Q1