This page lists all Change Requests received. This list will appear in Table 2 of the 2006 Report. The final versions of these Change Requests, stating how each was resolved, are also incorporated into Attachment C of the 2006 Report (submitted to the DTE in June 2006).
Please note that the Tariff itself -- in Attachments A and B -- is the authoritative version of the recommendations of the DG Collaborative, and is available at:
http://masstech.org/dg/collab-reports.htm
|
||
2006 Change Requests (Final Versions, pdf) |
Date Submitted |
|
|
||
|
||
|
||
|
||
5: Add question on exporting power to the Simplified application (Not approved) |
|
|
|
||
7: Correct Exhibit G, including re-naming it "Agreement between the Company and the Customer," correcting references to “Customer," and adding a note "to be signed by Company's retail customer where DG installation and interconnection will be placed, when retail customer is not the Interconnecting Customer" (Final) |
|
|
8: Process for selection of multiple interconnection procedures such as DTE Tariff, ISO-NE Smalll Gen (Final) |
|
|
9: Expand the size limit for inverter-base systems eligible for the Simplified process to include 25 kW for cases with a 3-phase inverter and proper electrical drawing, in addition to the present 10 kW for single-phase inverter (Final) |
|
|
10: Remove requirement of an external disconnect switch for Simplified (Final, with explanation for withdrawal) |
|
|
|
||
12: Require Company to complete System Modifications on a timely basis and to inform Customer of progress (Final) |
|
|
|
||
14: Clarify exemption of net metering (up to 60 KW) from insurance requirements (Final) |
|
|
|
||
16: Eliminate the 10 kW limit for Simplified Network Interconnection, but retain limit of 1/15 of the customer’s minimum load, with change to daytime load in the case of solar (Final) |
|
|
|
||
|
||
19: Extend self insurance option to entities that are not "companies" (Final) |
|
|
|
||
|
||
2005 Change Requests |
Date Last Updated |
|
Massachusetts Electric (Tim Roughan) Change Request 2 |
June 7, 2005 | |
| June 7, 2005 | ||
| June 7, 2005 | ||
Massachusetts Electric (John Bzura) Change Request (Letter) | Redlined Letter Change Request (Tariff) | Redlined Tariff |
June 7, 2005 | |
Massachusetts Electric (Tim Roughan) Change Request |
June 7, 2005 | |
| June 7, 2005 | ||
Western Mass Electric (Cindy Janke) Change Request |
June 7, 2005 | |
Massachusetts Electric (John Bzura) |
June 7, 2005 | |