DG Collaborative Meeting:


DG Collaborative Plenary Meeting
Monday, May 1, 2006
9:00 AM - 5:00 PM

Facilitator:  Abby Arnold, RESOLVE, Inc.

Location: National Grid's Energy Institute Room, Westboro

Call-in number: 866-330-1200 code 364-8872#

Before this meeting, please review the 4/21 version of the Redline of the Model Tariff in which the latest language has been incorporated from the Change Requests on which general agreement was reached in the April 11 Plenary, and on which additional agreement will be sought on particular tariff language at the May 1 meeting.

Agenda

Draft Meeting Agenda, 4/27 version after review by Process Committee


Minutes Next Steps Memo (5/5)

Attendees

 
 
  • Next (and Final) Meeting:
 

 

Contents of Ring Binder for this Meeting

Ring Binder Contents (1 page with list of Tabs, pdf)

Tab 1) Meeting Information to Date:

Tab 2) Ground Rules:

Tab 3) Tracking Data:

Tab 4) Change Requests Posted to Date (see Change Request web page for word versions and any more recent individual Requests)

  • The Change Requests on which on which general agreement was reached in the March 15 Plenary -- Requests #1 - 2, 5-b, 7 and 14 -- were reflected in the 4/7/06 version of the Redline of the Model Tariff.
  • The Change Requests on which on which general agreement was reached in the April 11 Plenary -- Requests #3, 12 and 15 -- are also reflected in the 4/21 version of the Redline of the Model Tariff.
  • For several of the other Change Requests, agreement has not been reached by the DG Collaborative Plenary -- including Requests #4, 6, 7, 8, 9, 14, 16, 17 and 18 -- and no revisions have been made to the tariff or to those Change Requests. 
  • MTC will hand out copies of all new and changed Change Requests at the May 1 meeting.

Tab 5) Redline of Model Tariff - Uniform Standards for Interconnecting DG

Tab 6) June 2006 Report drafts:

  • New for 5/1 binder -- drafts of possible Attachments to the June Report:

Tab 7) DTE Orders (were in 3/15 Binder):

Tab 8) Updates:

        Indemnification and Insurance Issues for State Facilities:

        Recommended Policy Items DTE Should Consider:

        DG and Distribution Planning:

        ISO-NE/FERC Small Gen Rules:

 

        Network Interconnection Issues (see also related sub-group below):

Sub-groups working on Followup between Meetings

  • Change Request #3, Establish expiration time frame for Interconnection Agreement (chair, Gusmano)
  • Change Request #6 and #11, Correct references to “certification” of equipment for screen #4 (chair, Bingham):
    • 3/22, 1:00 pm call (completed)
  • Change Request #7, When should the Interconnection Agreement be executed by (a) the end-use Customer or (b) the DG vendor? (chair, Cowell or Cummings)
  • Change Request #12-13, 12: Require system modifications on timely basis and reduce burden on Customer to pay tax "gross-up" (chair, Aronson)
  • Change Request #14, Clarify exemption of net metering (up to 60 KW) from insurance requirements (chair, Bingham)
  • State/public facility insurance and indemnification (co-chairs Klionsky and Wilson):
  • Network Interconnection (chair, Bzura):
    • 4/5 meeting at the Northboro offices of National Grid, to discuss the technical possibilities for interconnection of DG on network distribution systems. This was primarily a discussion of technical issues and options, but Bill Feero began the meeting with a brief presentation to give non-utility people a sense of the technologies and issues. Second, progress was made on a draft outline or table of contents on network interconnections.  
    • See also the recent (March 30) Rule 21 Working Group Report from California.
    • See also web page of Technical/Network Work Group for additional infomrtation and background on work done to date.
  • Final Report Table of Contents Key Sections – first draft writing assignments:
    • Recommended Policy Items DTE Should Consider (see above for -- "Distributed Generation: A Policy Overview," draft for discussion, proposed by a group of DG and environmental Members)

Other Recent or Significant Reference Materials

Tariff Work Group Materials (also posted at Tariff Work Group web page):

Technical/Network Work Group Materials (also posted at Technical Work Group web page):

Distribution Planning Work Group Materials (also posted at Distribution Planning Work Group web page):

  • _____, 2006 (yet to be posted): Final submittal letter to DTE, plus Attachment A, the “Interim Report on DG and Distribution Deferral,” by the Distribution Planning Work Group.

2005 Annual Report

Meeting Notice, Logistics:

Web conference access will not be available for this meeting.

Location: National Grid's Energy Institute Room, Westboro

Call-in number: 866-330-1200 code 364-8872#

See other resource materials at the following DG Collaborative web pages:

If you have questions, please contact Fran Cummings at MTC.